November 21, 2005
 
Closed Loop Systems
Underwood, ND – New ethanol production facility to be built next to electric generation facility; the excess heat from that plant will be used for the ethanol production process, saving $15 million in capital costs for the ethanol plant

Panda Energy – Have announced the building of three 100mgy plants that will all utilize shit-to-biogas for some/all of their heating requirements.  Note that they have announced their intentions to build a total of five of these 100mgy plants. The Hereford, TX plant will be built by Lurgi PSI (US office is in Memphis – based in Frankfurt, German – more here under Ethanol Plant Designers).  Profile article on Todd Clark/Panda in Houston Chronicle.

E3 BioFuels (aka Nebraska BioClean) – Building ethanol plant on location with 30,000 head feedlot in Mead, NE;  24mgy facility will have zero natural gas needs; WDG will supply 40% of feed needs of the cattle.  Cost, including feedlot and shit processor is $71 million.  US Patent 6,355,456 (filed Jan 19, 2000; David Hallberg & Victor W Schlesinger, assigned to Dakota Ag Energy, Inc.) covers an integrated continuous process for the production of ethanol and a bio-gas containing methane, involving a feedlot with slatted floors, the cattle being fed a diet with a range of 25-80% WTG.

Sunrise Energy Cooperative – Small-scale (5 mgy) system, designed by Katzen.  Unsure of current status.  A case study (pdf), funded by an Illinois org, was done in 2001.